Purpose of establishment

 
The sun becomes a dream, the land becomes a dream,
and the wind becomes a dream in our architectural design which stands in harmony with nature, the vessel for the dream of energy of the city of Seoul.
  • Facility Name
  • Seoul Energy Dream Center
  • Theme
  • A citizen-oriented comprehensive experiential exhibition center
  • Location
  • Within the Pyounghwa Park (1535-3, Sangam-dong) 14, Jeungsan-ro, Mapo-gu, Seoul
  • Size
  • Site area 13,039m², Building coverage 2,065.91m², Gross floor space 3,762.32m²
    ㆍ1st basement (394.02m²) : Water tank/rainwater tank control room, electricity room, power generator room ㆍ1st floor (1,309.63m²) : Dream center hall
    ㆍ2nd floor (890.46m²) : Green theme exhibition hall (special exhibition) ㆍ3rd floor (1,168.21m²) : Community hall (Multi-purpose room / Experiential education room / Book cafe / Office space, etc.)
  • Operation
  • Green education center. E-Gen Partners Co.,Ltd.
  • Parking
  • 19 parking slots (3 reserved for the handicapped)

 

Pushing Progress

  • 2012
  • 09.19
  • Initial completion of the construction of the energy zero house, Sangam-dong
  •  
  • 04.30
  • Approval for tentative use (tentative completion certification)
  •  
  • 04.12
  • Blower door test and performance evaluation by the German team
  • 2011
  • 10.17
  • Execution design by the German consortium for the change of the space plan completed
  •  
  • 06.24
  • CA service contract between the German consortium (PB + Frounhofer), the contractor, and the supervisor
  •  
  • 01.31~03.22
  • Termination of the contract with the German design team + Baho Construction and selection of the new partner (PB)
  • 2010
  • 08.20
  • The German design team visited Korea -> Decided to participate in the CA service
  • 2009
  • 12.29
  • Supervision contract and kick-off (Gil General Construction + 1)
  •  
  • 12.11
  • Construction contract and construction kick-off (DK Construction + 1)
  • 2008
  • 11.05
  • Kick-off of the basic and execution design works (Frounhofer + Baho Construction )
  •  
  • 07.15
  • Preferential project for renewable energy landmark Implementation plan (Doc # Mayor-386)